History
Since opening in March 2000 The London Eye has become an iconic landmark and a symbol of modern Britain. The London Eye is the UK’s most popular paid for visitor attraction, visited by over 3.5 million people a year. A breathtaking feat of design and engineering, passengers in the London Eye's capsules can see up to 40 kilometres in all directions.
The London Eye is the vision of David Marks and Julia Barfield, a husband and wife architect team. The wheel design was used as a metaphor of the turning of the century.
British Airways was the main sponsor of the London Eye until February 2008 and up until November 2005 were joint shareholders with Marks Barfield Architects and The Tussauds Group. British Airways also privately funded the London Eye project from the early stages of conception.
The London Eye is now operated by the London Eye Company Limited, a Merlin Entertainments Group Company.
Design and construction
Designed by architects David Marks, Julia Barfield, Malcolm Cook, Mark Sparrowhawk, Steven Chilton and Nic Bailey, the wheel carries 32 sealed and air-conditioned passenger capsules attached to its external circumference. Each capsule holds approximately 25 people, who are free to walk around inside the capsule, though seating is also provided. It rotates at 26 cm (10 in) per second (about 0.9 km/h (0.5mph) so that one revolution takes about 30 minutes. The wheel does not usually stop to take on passengers: the rotation rate is so slow that they can easily walk on and off the moving capsules at ground level. It is, however, stopped to allow disabled or elderly passengers time to embark and disembark safely.
The rim of the Eye is supported by tie rods and resembles a huge spoked bicycle wheel, and was depicted as such in a poster advertising a charity cycle race. The lighting for the London Eye was redone with LED lighting from Color Kinetics in December 2006 to allow digital control of the lights as opposed to the manual replacement of gels over fluorescent tubes.
Mace were responsible for construction management with Hollandia as the main steelwork contractor and Tilbury Douglas as the civils contractor. Consulting engineers Tony Gee and Partners designed the foundation works while Beckett Rankine designed the marine works. The wheel was constructed in sections which were floated up the Thames on barges and assembled lying flat on piled platforms in the river. Once the wheel was complete it was raised into an upright position by a strand jack system, being lifted at 2 degrees an hour until it reached 65 degrees. It was left in that position for a week while engineers prepared for the second phase of the lift. The total weight of steel in the Eye is 1,700 tonnes (1,870 short tons). The project was truly European with major components coming from six countries: the steel was supplied from the UK and fabricated in The Netherlands by the Dutch company Hollandia, the cables came from Italy, the bearings came from Germany, the spindle and hub were cast in the Czech Republic, the capsules were made by Poma in France (and the glass for these came from Italy), and the electrical components from the UK. (Mann, Thompson, Smits, 2001)
Credits : http://en.wikipedia.org/
No comments:
Post a Comment